In mid February 2024 we installed a Flexi-Pave sidewalk totaling 170 SF in color Comet. We also performed demolition & disposal of existing hard surface and non-invasive air spade excavation.
In mid February 2024 we installed a Flexi-Pave sidewalk totaling 170 SF in color Comet. We also performed demolition & disposal of existing hard surface and non-invasive air spade excavation.