Brightview Columbia – Columbia, MD

Tuesday, June 29th, 2021

In late June 2021 we completed a 1,438 SF Flexi-Pave courtyard area in color Olive Fog. We also installed a 699 SF Flexi-Pave overlay in color Evergreen on top of an existing concrete slab.

To view project photos click here

Catoctin Mountain Park Camp Misty Mount – Thurmont, MD

Thursday, June 10th, 2021

We completed a 570 SF pathway in color Chestnut in early June 2021.

To view project photos click here

Smithsonian’s National Zoo Asia Trail

Thursday, May 13th, 2021

In May 2021 we finished pouring 32,433 SF of beautiful chocolate brown concrete. We also installed two soft surface play areas as well. Additionally we placed a 22 LF reinforced concrete wall. We also installed 4 concrete drain surrounds, one by the otters location, and the other 3 by the panda house.

To view project photos click here

Four Mile Run Park – Alexandria, VA

Wednesday, April 28th, 2021

In late April 2021 we completed the picnic table and bike rack installation which included the following:

Sawcut Existing asphalt
Subbase preparation including excavation of gravel/permeable subbase, table and bike rack foundation, grading of swale
2 Nyloplast Basins
1 cleanout
4” diameter Perforated PVC Pipe
675 SF Flexi-Pave pads in color Earl Grey with metal edging
2 picnic tables
3 bike racks

To view project photos click here

Residential Improvements – Sterling, VA

Tuesday, April 20th, 2021

In April 2021 we installed a 192 SF Flexi-Pave patio in color Cabernet as well as a 16 SF Flexi-Pave pad at back gate also in color Cabernet. Additionally, 57 SF of All-Stone strips in color River Rock were placed along the driveway. Brick edging was incorporated too. Other aspects of the job included installing a concrete block retaining wall and synthetic turf.

To view project photos click here

26th St NW Park – Washington, DC

Tuesday, March 30th, 2021

This 125 SF Flexi-Pave sidewalk in color Comet was installed in late March 2021.

To view project photos click here

Eckington Park – Washington, DC

Friday, March 19th, 2021

In March 2021 we completed a 200 SF All-Stone permeable sidewalk in color Botticino Marble.

To view project photos click here

Flower Ave Streetscape Improvements – Takoma Park, MD

Monday, December 7th, 2020

In December 2020 we completed 1,445 SF of Flexi-Pave sidewalks in color Mossy Slate. 1,080 SF of pavers were placed as well. We also performed many tree preservation and landscaping tasks such as supersonic air spade excavation, root pruning, and plantings of trees, shrubs, and perennials.

To view project photos click here

The Kiley – Washington, DC

Friday, December 4th, 2020

In December 2020 we completed this 816 SF Flexi-Pave sidewalk in color Mossy Slate.

To view project photos click here

Phase I Town Square at Suitland Federal Center – Suitland, MD

Wednesday, November 18th, 2020

In November 2020 we completed 1,979 SF of Flexi-Pave courtyards in Phase I, called Grand Park, in colors Forest Green and Beach Stone. At a later date we will return to complete Phase II called Central Park.

To view project photos click here