Woodgrove Park – Roundhill, VA

Wednesday, December 15th, 2021

In mid-December 2021 we installed 1,064 SF of Flexi-Pave pads between batting cage & dugout as well as in soft toss area in color Peppermill.

 

Residential Driveway – Annapolis, MD

Friday, December 3rd, 2021

This 783 SF Flexi-Pave driveway was completed in early December 2021 in color Mossy Slate. It includes an aluminum edging perimeter. Non-invasive air-spade excavation was performed in the critical root zone. We also installed a new new concrete apron as well.

 

GMU Thompson Hall & Fenwick Library – Fairfax, VA

Thursday, December 2nd, 2021

In early December 2021 two Flexi-Pave sidewalks were installed totaling 520 SF in color Earl Grey. We also performed non-invasive air-spade excavation.

UVA South Pond Park – Charlottesville, VA

Friday, November 19th, 2021

This 1016 SF Flexi-Pave sidewalk in color Mossy Slate was installed in late November 2021.

 

Kaiser Permanente – Woodbridge, VA

Tuesday, November 16th, 2021

In mid-November 2021 we completed a 992 SF Flexi-Pave all-rubber sidewalk in color Olive Fog.

 

Woodend Sanctuary Stream Restoration – Chevy Chase, MD

Tuesday, September 14th, 2021

In mid-September 2021 we completed this 15,472 SF All-Stone permeable trail in color River Rock.

To view project photos click here

Reconstruction of Oregon Ave NW – Washington, DC

Saturday, August 14th, 2021

In mid-August 2021 we competed 3,124 SF of All-Stone permeable sidewalks in color Beach Stone.

To view project photos click here

West Elementary School – Washington, DC

Friday, July 30th, 2021

We paved a 293 SF All-Stone porous sidewalk in color Botticino Marble in late July 2021. We also performed many tree preservation tasks as well such as: SSAT root pruning, aerate/decompact soil, cambistat tree growth regulator, soil amendments, IPM inspections, biostimulants, and tree IV drip irrigation system.

To view project photos click here

Brightview Columbia – Columbia, MD

Tuesday, June 29th, 2021

In late June 2021 we completed a 1,438 SF Flexi-Pave courtyard area in color Olive Fog. We also installed a 699 SF Flexi-Pave overlay in color Evergreen on top of an existing concrete slab.

To view project photos click here

Catoctin Mountain Park Camp Misty Mount – Thurmont, MD

Thursday, June 10th, 2021

We completed a 570 SF pathway in color Chestnut in early June 2021.

To view project photos click here