Key Elementary School – Washington, DC

Thursday, September 17th, 2015

In mid-September 2015 a 2,269 SF Flexi-Pave trail was installed at Key Elementary School. Chosen Flexi-Pave color is Mossy Slate.

From DC Department of General Services Site: “The proposed concept design includes a sports field, new track, integrated basketball/tennis courts, traditional and developmental play equipment. There will also be new spaces for theatrical performance, outdoor chalk art, and landscape features. Finally, new and enhanced natural areas allow students to learn about the environment in an outdoor science classroom, interactions with water systems, and a new nature walk / track around the perimeter of the school grounds.”

Key Elementary School Plan Sheet

Stoddert Elementary School – Washington, DC

Tuesday, August 11th, 2015

In early August 2015, a 1380 SF Flexi-Pave trail with steel edging was installed at Stoddert Elementary School. Chosen Flexi-Pave color is Olive Fog.

Stoddert ES Plan Sheet

Residential Driveway – Takoma Park, MD

Tuesday, August 4th, 2015

This 686 SF driveway was completed in early August 2015. Chosen Flexi-Pave color is Mossy Slate.

Make-A-Wish Playground & Walkway – Crofton, MD

Thursday, July 30th, 2015

Capitol Flexi-Pave was proud to work with Make-A-Wish Foundation in making Carlin’s wish come true.

June 2015 Letter from Make-A-Wish Foundation: “The Mid-Atlantic Chapter has been granting wishes to children battling life-threatening medical conditions in Northern Virginia, Washington D.C., Maryland and central and southern Delaware for the last 30 years. More specifically we need your help to grant the wish of Carlin, age 6 from Crofton, Maryland. When Carlin was two years old her parents noticed that she was not walking and moving like other children her age. After finding out Carlin has a developmental condition that does not allow her muscles to form normally, they then found out that she was also diagnosed with leukemia. Between therapies, and treatments Carlin has been through more in her short six years than most of us have in our adult lives. When Carlin found out she could receive a wish, she knew immediately that she wanted a garden play set in her backyard. Carlin’s play set will not just provide endless hours of fun but can also help with many of her developmental conditions. Due to her condition a play set like this will help Carlin build up muscle growth and act as ongoing therapy…For every wish granted by our local Chapter there are at least two more children waiting to receive their wish of a lifetime. Partnerships, like ours, help the Chapter fulfill their mission of granting a wish to every eligible child in their community. Thank you very much for your support and for helping us to share the power of a wish.”

The Flexi-Pave portion of the work was completed in late July 2015. Chosen colors for Flexi-Pave playground consisted of alternating bands of Olive Fog (720 SF) and Redwood (1128 SF). Additionally, a 754 SF walkway was installed; Flexi-Pave walkway color is River Rock.

Make-A-Wish Carlin’s Strawberry Dream Video

Make a Wish Paving Plan Sheet

The Views at Huntington – Alexandria, VA

Monday, July 27th, 2015

A 323 SF Flexi-Pave fitness pad was installed in late July 2015; Flexi-Pave color is Chestnut

The Views at Huntington Plan Sheet

Woodstock Park – Arlington, VA

Thursday, July 23rd, 2015

In late July 2015, we installed a 2,944 SF Flexi-Pave trail at Woodstock Park. Chosen Flexi-Pave color for the trail is Coal Mine. This trail is part of their Playground Redesign and Basketball Court Renovation. A little background: Woodstock Park site reports: “A kickoff presentation outlining the design development phase of the park was held at the Waverly Hills Civic Association General Meeting (Glebe Elementary School Multipurpose Room) on June 13, 2012 at 7:30 p.m. Funds were allocated to redesign the existing playground, as well as renovate the existing basketball court at Woodstock Park. Playground equipment, playground surfacing, pedestrian circulation (including ADA accessibility), site furnishings, and stormwater management are among the major project components and goals. A community design group was formed and two meetings were held on July 18, 2012 and Sept. 11, 2012. A conceptual design was developed with input from the design group and a final conceptual design was presented and approved at the Waverly Hills Civic Association General Meeting (Glebe Elementary School Multipurpose Room) on Nov. 14, 2012.”

You can download an electronic copy of the drawings and specifications using the following links:

Woodstock Park Drawings
Woodstock Park Specifications

George Mason University – Fairfax, VA

Monday, July 6th, 2015

Installation of a 578 SF Flexi-Pave sidewalk at George Mason University (GMU) was completed in early July 2015. Flexi-Pave color is Earl Grey. This was part of GMU’s Fenwick Library Addition Phase II. To prevent injury to critical root zones of adjacent trees, soil was excavated to root refusal depth using supersonic air knife. Click on the following link to view construction history: Fenwick Online Construction Update System.

GMU Sidewalk Plan Sheet

Takoma Park Community Center – Takoma Park, MD

Wednesday, June 24th, 2015

Installation of several Flexi-Pave bike pads at Takoma Park Community Center was completed in late June 2015. Total SF is 97 and color is Mossy Slate.

Takoma Park Recreation Center – Takoma Park, MD

Tuesday, June 23rd, 2015

Several Flexi-Pave bike pads were installed at Takoma Park Recreation Center in late June 2015. Chosen color is Mossy Slate and total SF is 95.

Residential Basketball Court & Driveway – Washington, DC

Thursday, June 11th, 2015

Installation of a 1080 SF Flexi-Stone residential basketball court and driveway was completed in late June 2015. Color is Delaware Grey.

Residential Basketball Court-Driveway Plan Sheet